Sign In | Join Free | My himfr.com
Home > Low Pressure Foam Machine >

Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³

Dongguan Zehui machinery equipment co., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ from wholesalers
     
    Buy cheap Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ from wholesalers
    • Buy cheap Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ from wholesalers
    • Buy cheap Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ from wholesalers

    Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³

    Ask Lasest Price
    Brand Name : ZHMACH
    Model Number : ZHF-2017
    Certification : CE Certificate
    Price : inquiry
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 1.5 set per month
    Delivery Time : shipped in 45 days after payment
    • Product Details
    • Company Profile

    Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³


    Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³

    (1)Main technique specification:

    1, Dimension:Total length 33m×Total width 4m×Total Height 3m,Roller ( 3 m)
    2, Foaming material Group: 13 groups, man-machine interface, automatically computer control
    3, Foaming width: 980mm~2250mm
    4, Foaming height: Max 1200mm
    5, Foaming density: 8Kg/m³~100kg/m³
    6, Foaming speed: 2000r/min~7000r/min
    7, Max total output:300kg/min
    8, Material spraying way:
    ① The way of down sprayer head (upper, down, front, back can be adjusted)
    ② the way of trough overflow pipe.
    9, Controlling way of foaming:
    ①PLC controlling, can continuously foaming two different formulas in one time
    ②All inverter controlling foaming and work in phase with the production line
    ③Oven declining board height and width can be adjusted by control box.
    ④Oven side links width can be adjusted by control box.
    10, Mixing –head motor: 37kw

    Machine Main Specifications:

    Oven Length18mInner Conveyer length

    18m

    Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
    Foaming Width1.0-2.25mConveyer Belt Speed0-8m/min
    Foaming Density8-100kg/m3Fall PlateSix section adjustable
    Total Power130KWTotal output100-300kg/min
    MotorDongguan/SiemensPumpU.S. Viking /Japan Shimadzu/China Shanghai


    (2)Transducer Types

    ModelPower/kw

    Use

    QtyBrand
    G12037

    Mixing head

    1Siemens
    G1207.5

    POP, CaCo3

    2Siemens
    G1205.5

    PPG,

    1Siemens
    G1204

    TDI, Flame retardant

    2Siemens
    G1202.2

    MC, color

    2Siemens
    G1201.5

    Water, Ann, Si, Tin, Color Anti-yellow etc

    7Siemens
    G1200.75

    Spray head

    1Siemens
    VFD-B5.5/3.7/1.5

    Oven inner conveyer line,side conveyer line, cutting machine

    3Delta

    Terms of Payment: 30% advance payment by T/T upon signing the contract
    70% covered by T/T before delivery or sight confirmed L/C.

    Installation and Start-up: 2 technicians will be assigned to coordinate installation,commissioning and
    training, cost for flight and suitable accommodation plus USD50/day will be charged additionally.

    Warranty: 12 months limited warranty. Starting from date of delivery excluding wear parts.
    Shipping cost for parts to be replaced during warranty period have to be borne by the customer.

    FAQ


    Q: How many days for the install and testing of the machine?

    A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

    Q: For the cost of the engineer how much I need to pay?

    A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

    Q:What kind of raw material tools we need to prepare for the testing?

    A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

    Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

    A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.



    Quality Flexible Low Pressure Mattress Foam Production Line With PLC Control , 60Kg / m³ for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Dongguan Zehui machinery equipment co., ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)