Sign In | Join Free | My himfr.com
Home > Foam Making Machine >

Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress

Dongguan Zehui machinery equipment co., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress from wholesalers
     
    Buy cheap Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress from wholesalers
    • Buy cheap Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress from wholesalers

    Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress

    Ask Lasest Price
    Brand Name : ZHMACH
    Model Number : ZHP-2017
    Certification : CE Certificate
    Price : inquiry
    Supply Ability : One set per month
    Delivery Time : 45 days
    • Product Details
    • Company Profile

    Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress


    Automatic Continuous Multiple Hot Sponge Block Making Machine Line for Mattress


    Product Description

    This machine is mainly used for continuous production of sponges with a density of 8-100kg/m³. Using a touch screen control system with a high degree of automation and more flexible operation, users can store 10 different recipes and adjust them at any time, and can remotely control them through the Internet, making cost control more scientific and intuitive.

    [Specifications]


    TECHNICAL SPECIFICATIONS

    Model

    ZHF-2017

    Foaming group

    13 Groups

    Foaming type

    Sprayer/Trough

    Foaming width

    1150~2250mm

    Foaming heigh

    1300mm

    Foaming density

    8-100kg/m³

    Foaming speed

    2000-8000mm/min

    Max.output

    200L-350L/min

    Mixing head power

    37KW

    Total power

    130KW

    Oven length

    18000mm

    Machine external size

    L35000*W4500*H4200mm



    (1)The whole machine parts specifications:


    1.Foaming control Platform(standard) L3m×W2.52m×H0.7m
    2.Oven declining board (standard) L9m×W0.98m~2.30m
    3.Oven side links(standard) L18m×W2.3m×H1.2m
    4.Oven machine frame(standard) L18m ×W4m×H3m
    5.Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
    6.Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

    MotorGuangdong brand
    PumpViking pump & Chinese pump
    InvertorSiemens brand
    PLCSiemens
    TemperatureControl system

    TypeUseSpecificationQty
    Big material tankPPG5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
    Big material tankPOP5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

    1


    Big material tankCaCo35m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
    Big material tankTDI5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

    1


    Big material tankFlame retardant2m³/δ3m stainless steel, with filter system1
    Big material tankMC2m³/δ2mm stainless steel, with filter system1
    Small material tankSi180L/δ1mm stainless steel1
    Small material tankA-33180L/δ1mm stainless steel, with filter system1
    Small material tankT9180L/δ1mm stainless steel, with filter system1
    Small material tankH2O180L/δ1mm stainless steel1
    Small material tankColor180L/δ1mm stainless1
    Small material tankAnti-yellow180L/δ1mm stainless steel1
    Small material tankBlack180L/δ1mm stainless steel1
    Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
    Filter tankPOP, Powder1.5m³/δ4mmA3 steel plate1
    Packing & shiping

    How is the packing of the machine?

    The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

    How many container will be needed for the whole set of machine?

    Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

    We will try the best way to pack all the machine well and also save the freight cost.

    FAQ

    Q: How many days for the install and testing of the machine?

    A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

    Q: For the cost of the engineer how much I need to pay?

    A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.



    Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress


    You are warmly welcome come and visit our factory.

    Quality Automatic Continuous Low Pressure Polyurethane Foam Machine PLC For Mattress for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Dongguan Zehui machinery equipment co., ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)